Schedule a briefing
Edge Realm

Sovereign AI infrastructure with compliance built in.

Containerized, immersion-cooled modular compute. Installed at your site, owned by you, deployed in under 100 days. Built for organizations that cannot accept cloud dependency for sovereign data and process workloads.

The challenge

Sensitive AI runs on borrowed infrastructure.

Four forces making sovereign compute a board-level problem right now.

Cloud AI leaks sovereignty.

Even "sandboxed" cloud environments risk your proprietary processes, model weights, and keys ending up as training data for someone else.

Sovereignty is now board-level.

83% of 3,700 IT leaders across 21 countries report data-sovereignty and repatriation pressure has grown in the past 12 months. 65% have already changed cloud strategy in response.

SiliconANGLE (Kyndryl survey, 2026) ›

The repatriation wave is here.

Gartner projects a ~20% shift of cloud IaaS workloads from global hyperscale to local and sovereign providers. "Geopatriation" is underway.

SiliconANGLE (Gartner projection, 2026) ›

Legacy builds fail.

18-36 month build-outs, power and water demands the grid cannot always meet, GPU fleets obsolete in 3-5 years, and DDIL environments (defense, federal, energy, utilities) cannot use public cloud at all.

The delta

What ER Vault™ delivers vs. a traditional data center build.

Every number here comes from independent third-party research. Links to each source below.

<100 days
Deployment
First production unit at site vs 18-36 months for traditional builds
Edge Realm manufacturing commitment
40%
Less electricity
PUE 1.03 target vs 1.54 industry average
98%
Less on-site water
Immersion cooling eliminates evaporative water loops
34-75%
Lower $/MW build
$5.84M/MW platform cost vs $8.9M-$23.3M greenfield data center

One platform. Two pillars.

ER Vault™ is the physical infrastructure. ER Cyber Membrane™ is the compliance-by-design control layer that ships with every unit.

ER Vault™

Containerized, immersion-cooled modular compute.

Owned by you. Installed at your site. Deployed in under 100 days. Sized from 50 kW to 1 MW per unit, scalable across a fleet.

See the platform ›

ER Cyber Membrane™

Compliance-by-design control layer.

Framework gates, provenance chain, bound remediation tokens, multi-framework tailoring, air-gapped by default. ISO/IEC 42001, NIST SP 800-53, and CMMC aligned.

Request the Technical Summary ›
Sectors

Six sectors where cloud is the wrong answer.

Sovereignty, compliance, or site conditions make hyperscale cloud economically or legally unworkable. These are the organizations we build for.

Start where it matters: data, process, or site.

A thirty-minute briefing covers architecture, compliance posture, deployment path, and whether a Blueprint engagement is the right next step.